Quick answer
What is my order judged against if the coal arrives different, and when do I fix it?
Fix two things before production starts: a sample you have approved, and a specification sheet that carries its targets. As offered terms, the factory keeps that reference sample, labeled with its order, so that reorders are matched to it. It also keeps 25 kg from each container order for 1 year and, as an offered term, compares it with what a buyer reports in a claim.
1. The lock in three parts: sample, sheet, retained sample
The lock has three parts, and each one answers a different question later: what you approved, what the order promised, and what the factory loaded.
| Part | What it is | Status |
|---|---|---|
| Approved sample | Free samples of 1 to 10 kg, sent by DHL or EMS, paid by the buyer; once you approve one, it is packed and labeled with the order it belongs to | Offered terms, confirmed in your quote |
| Specification sheet | Targets for grade and ash, shape and size with tolerance, count per kilogram, moisture and packing | Targets, agreed for each order |
| Retained sample | 25 kg from each container order for 1 year | Declared by the factory |
Definition
reference sample
A reference sample is a sample the buyer has approved, kept so that later production can be compared with it.
Definition
spec lock
A spec lock is the agreement that fixes an order's specification, and the sample it is judged against, before production starts.
Samples are requested through the samples page. The coal in a sample is the coal of one batch, so the sample you approve should come from the shape and grade you mean to order.
2. What goes on the specification sheet
The sheet turns the approved sample into figures that the factory's checks can be read against. Each line has a page that explains it.
| Line | Target on file | Explained on |
|---|---|---|
| Grade and ash | Platinum 1.6–1.9%, Super Premium 1.9–2.3%, Premium 2.3–2.5% | The grades and their ash targets |
| Shape, size and tolerance | ±0.3 mm per side per piece | Shapes and sizes |
| Count per kilogram | About 72 for a 25 mm cube | Shapes and sizes |
| Moisture | 3–4% after drying | The six checks and their stages |
| Packing | Inner box of 1 kg, 500 g, 250 g; master carton of 10 kg or 20 kg (cube 25, 26 and 28 mm) | How the charcoal is packed |
All of these are targets, not results of a test. The sheet itself, line by line, is on the page about the specification sheet. A brand that prints its own boxes adds its artwork to the sheet: see private label.
3. Declared, offered and not declared
Three kinds of statement meet in a spec lock, and they do not carry the same weight. The lists below keep them apart.
- Declared by the factory: it keeps 25 kg from each container order for 1 year; it tells the buyer before it changes the shell charcoal source, the binder, the press settings or the packaging.
- Offered terms, confirmed in your quote: the approved sample is kept and labeled with its order; the retained sample is compared with what you report, when a claim is raised; a buyer's third-party inspector is welcome before shipment.
- Not declared yet: how long the approved sample is kept.
Note
Write the offered terms you rely on into your order. A term confirmed in the quote binds; a line on this page does not.
4. On a reorder: name the earlier order and its sheet
A reorder starts from the earlier order, not from a new description. Name that order and its specification sheet in your request, so that the batch is pressed to the same targets and matched to the same approved sample.
If you want something different this time, a new grade, a new box or a new size, it is a new line on the sheet. If the factory has to change something on its side, it tells you first, under the change notice.
Users notice a changed coal before anything else: the complaint that a box is not like the last one comes up more than any other, on the page about coal that differs from the last box.
5. When the coal differs from the sample
When a container arrives, the coal is checked against the sheet and the approved sample, in the first days, because the factory accepts a claim within 14 days after arrival.
The checks a buyer can run without a laboratory are on the page about the arrival check. What to send if the coal differs, and what the factory does then, is on the page about making a quality claim.
To have a sample, a sheet and a retained sample set up for your first order, use the quote form or the form below.