Quick answer
How do I know the tenth container will match the first?
The factory tells the buyer before it changes any of four things: the shell charcoal source, the binder, the press settings or the packaging. Every batch of shisha charcoal passes six checks, and the factory keeps 25 kg from each container order for 1 year. A claim is accepted within 14 days after arrival, with photos and videos.
In this section
-
Shisha Charcoal Specification Sheet — Every Target on One Page
The specification sheet lists every parameter of an order with its target, from shape and size to grade, moisture and packing.
-
Six Checks on Every Batch — Where Each Is Done, What Fails
The factory runs six checks: size, moisture, ash, burn test, drop test and count.
-
Spec Lock and Reference Sample — Fix Both Before Production
Fix two things before production starts: a sample you have approved, and a specification sheet that carries its targets.
-
Change Notice — Four Things the Factory Tells You Before Changing
The factory tells the buyer before it changes any of four things: the shell charcoal source, the binder, the press settings or the packaging.
-
Shisha Charcoal Lab Reports — What to Ask For, How to Check One
A laboratory report states measured values for one sample: usually moisture, ash, volatile matter and fixed carbon.
-
Arrival Check for Shisha Charcoal — Six Checks Before Day 14
Check a container in the first days after arrival, because the factory accepts a claim within 14 days and asks for photos and videos.
-
Quality Claims — 14 Days, Photos and Videos, What We Do
The factory accepts a claim within 14 days after arrival.
1. Four things that are not changed without notice
Four things decide how a pressed coal behaves, and the factory does not change any of them without telling the buyer first. As declared: The factory tells the buyer before it changes the shell charcoal source, the binder, the press settings or the packaging.
| What is not changed without notice | What a user notices if it changes | The check that shows it | Problem page |
|---|---|---|---|
| The shell charcoal source | More or less ash, or a different ash color | Ash, burn test | Too much ash |
| The binder | A smell while the coal heats | Burn test | Smell when lighting |
| The press settings | A different count per kilogram; a shorter or cooler session | Size, count, burn test | Burns too fast or too cool |
| The packaging | Damp coals that are hard to light; broken pieces in the carton | Moisture at packing, drop test | Coals that go out |
Definition
batch control
Batch control is the set of checks and commitments a factory uses to keep one production run the same as the last.
A change is not a fault in itself. The fault is a change the buyer learns about from customers, which is the most frequent of the problems users report with charcoal: a box that differs from the last one. What the notice covers, and what to write into an order about it, is on the page about the change notice.
2. Six checks on every batch
Every batch passes six checks: size, moisture, ash, burn test, drop test and count. Five of them have a declared stage; the stage of the ash check has not been declared, so the table shows none.
| Check | Stage, as declared | The complaint it answers |
|---|---|---|
| Size | After packing | Pieces that differ in size from one carton to the next |
| Moisture | After the oven and at packing | Coals that are hard to light or go out |
| Ash | Stage not declared yet | More ash than the grade should leave |
| Burn test | Before the oven, after the oven and after packing | Smell, smoke and low heat |
| Drop test | After packing | Pieces that crack or crumble |
| Count | After packing | A different number of pieces per kilogram |
Moisture is the check with a declared figure: the ovens dry the coals for 2 to 3 days, to 3–4% moisture, and the value is checked again at packing. What each check consists of is set out under the six checks at each stage, and the stages themselves under how the coal is made here.
3. Six reasons a batch is rejected
The factory has named what makes it reject a batch. As declared, there are six reasons: smell, low burning temperature, cracks, splits, smoke and high ash.
| Reason for rejection | Explained on |
|---|---|
| Smell | What burns off first |
| Low burning temperature | What sets burn time and heat |
| Cracks | Causes and the drop test |
| Splits | Causes and the drop test |
| Smoke | What burns off first |
| High ash | Where ash comes from |
Note
The factory has declared the reasons, not a pass limit for each. No limit is shown on this site until one is declared; the targets for an order are on its specification sheet.
4. The retained sample: 25 kg, kept for one year
The factory keeps 25 kg from each container order for 1 year. The sample is taken from the order itself, so it shows what was shipped and not what was promised.
Verified
If a container differs from what was agreed, there are three things to compare: what arrived, the retained sample and the specification sheet for the order.
The sample matters most when a claim is made. The factory accepts a claim within 14 days after arrival; the buyer sends photos and videos, the factory investigates, and if the fault is its own it compensates with a discount or with free charcoal in the next batch.
What to photograph and film for each kind of problem, so that a claim can be checked the first time, is on the page about making a quality claim. Keep a reference carton from every container on your side as well: a comparison needs two samples. The checks to run in the first days after arrival are on the page about the arrival check.
5. The specification sheet for your order
The checks need something to check against, and that is the specification sheet. It lists every parameter of an order with its target: shape and size, pieces per kilogram, grade with its ash target, moisture, binder and packing.
The figures on this site are targets and planning figures. The sheet agreed for an order is the one that binds, and it is the document a claim is read against. Its lines, and the problem each line prevents, are on the page with the specification sheet.
Tip
Approve a sample first, then write its values into the sheet and attach the sheet to the purchase order. A target that is written down can be checked; a target that was only discussed cannot. Both parts are set out under the spec lock and reference sample.
6. Laboratory reports
No laboratory report is shown on this site, and no laboratory is named. The six checks above are the factory's own checks on its own batches; they are not the measurements of an outside laboratory.
A buyer who needs measured values asks for a report on a sample. Which report covers which parameter, and seven points to check on any report a supplier sends, are on the page about laboratory reports. To have the commitments on this page written into an offer, use the form below or the quote request page.