Quick answer
I have two prices for shisha charcoal. Are they for the same thing?
Two quotes compare only when seven fields match: delivery term, port, container size, unit, grade, packing and validity date. This factory publishes all seven with its list, as one price basis: FOB Jakarta, a 40 ft container, USD per metric ton, per grade, in full packaging and in bulk, with a validity date.
1. The seven fields a quote must state
A price means nothing without the conditions it is quoted on. Ask every supplier for the same seven fields, and compare prices only when all seven match.
Definition
price basis
A price basis is the set of conditions a price is quoted on: the delivery term, the port, the container size, the unit, the grade, the packing and the validity date.
| Field | What to ask the other supplier | On this factory's list |
|---|---|---|
| Delivery term | Which Incoterms rule is the price at? | FOB |
| Port | Which port does the term name? | Jakarta |
| Container size | Is the price for a 20 ft or a 40 ft container? | 40 ft |
| Unit | Per metric ton, per kilogram or per carton, and in which currency? | USD per metric ton |
| Grade | Which grade, and what is its ash target? | Platinum, Super Premium and Premium |
| Packing | Full packaging or bulk, with which inner and master weights? | Full packaging and bulk, one price each per grade |
| Validity date | Until when is the price valid? | A validity date, printed with the list |
What the listed term includes, line by line, is on the page about what the FOB price covers, and the two packing columns are explained under full packaging and bulk.
2. Five ways two quotes fail to match
Most offers that look lower differ in one of five fields. None of them says anything about the coal; each one changes what the number stands for.
| What does not match | What it does to the comparison |
|---|---|
| The unit | A price per kilogram or per carton is a different number for the same goods. Convert both to one unit first. |
| The packing tier | A bulk price leaves out the printed inner box that a full-packaging price includes. |
| The container size | A price for a 20 ft container is worked out on a different load from a price for a 40 ft. |
| The delivery term | Another term moves the line between the seller's costs and the buyer's, so the two prices cover different things. |
| The validity date | A price past its date is no longer an offer, so it cannot be held against one that is. |
The container size also sets how many tons one order holds. As a planning figure a 40 ft container holds 26.5 t of any shape here, and the loads of a 20 ft by shape are under container loads. The costs that come on top of an FOB price are listed under from FOB to your warehouse.
3. Grade names are not a standard: compare the ash target
A grade name is each supplier's own label, so two suppliers' Premium need not be the same coal. At this factory the grade is set by its ash target, and the target is what to compare.
| Grade | Ash target |
|---|---|
| Platinum | 1.6–1.9% |
| Super Premium | 1.9–2.3% |
| Premium | 2.3–2.5% |
Ask any supplier for the ash target behind its grade name, and write the target for your order on the specification sheet. What each grade means for the user is on the page about the three grades.
4. What changes an offer besides its price
Two quotes with the same price can still be different offers. Four fields that sit outside the price decide how an order runs and what happens when something goes wrong.
| Field | Why it changes the offer | At this factory |
|---|---|---|
| Payment stages | How much is paid before production, and when the balance falls due | A 50% deposit, with the balance before the container is stuffed, on a first order |
| Lead time | When the container can be loaded | 21 to 25 days of production for a 40 ft |
| Claim window | How long you have to report a fault after arrival | 14 days after arrival |
| Retained sample | What a complaint is compared with | The factory keeps 25 kg from each container order for 1 year |
Each one has its own page: payment terms, order steps and lead time and quality claims. Which delivery terms the factory quotes besides FOB is set out under delivery terms.
5. One line to send to every supplier
The quickest way to get comparable quotes is to ask every supplier the same question. Send this line, filled in, to each one.
The line to send
Please quote FOB [port], a [20 ft or 40 ft] container, per metric ton in [currency], grade [name] with its ash target, [shape and size], [full packaging or bulk] with the inner and master weights, and state until when the price is valid.
This factory answers the same line through the form below or the quote request page. Its list already states the basis, FOB Jakarta, 40 ft, USD per metric ton, so the reply adds only what your order changes.