Quick answer
How does an order run, and how long until my container is loaded?
An order runs in eight steps: quote, samples, specification sheet, proforma invoice and payment, production, checks, loading, documents. Oven drying alone takes 2 to 3 days, and the plant makes a declared 5 tons a day. The lead time for your order is written in the quote.
1. The eight steps of an order
An order runs in the same eight steps whether it is the first or the tenth. Each step has something the buyer sends, something the buyer gets and a desk that answers.
-
Request a quote
You send the order fields. Shape, grade, packing, container size, destination and delivery term. You get a dated quote with the price, the load, the payment stages and the lead time. Answered by Erlangga Wicaksono, Export Sales Director.
-
Test samples
You test before you order. You name the shapes and grades you want to see. You get a parcel to test with the same checks the factory uses. Answered by export sales.
-
Agree the specification sheet
The targets are written down. You approve a sample and the sheet lists every target for the order: size, pieces per kilogram, grade, moisture and packing. Answered by quality control.
-
Confirm the proforma invoice and pay the first stage
The order becomes firm. You check the proforma invoice against the quote and the account name against the legal name, then pay the stage it states. Answered by export sales.
-
Wait for production
The coal is made. The charcoal is pressed, dried in the ovens and weathered before packing. Own-brand boxes are printed in the same period.
-
Ask for the check results
Every batch is checked. The factory runs its six checks on the batch and keeps a sample from your order. Whether the results are sent to you before loading is agreed in the quote. Answered by quality control.
-
Follow the loading
The container is packed. The cartons are loaded and the container is sealed and sent to the port. Ask for photos of the loaded container. Answered by Cipto Winarno, Logistics Department Head.
-
Check the documents
The papers follow the cargo. You receive the drafts of the shipping documents, check them against the order and receive the final set. Answered by logistics.
The first two steps have their own pages: the quote request form and the sample request form. The sheet of step three is described under the specification sheet, and the stages of step four under the payment terms.
2. What sets the time
Four things set how long an order takes, and none of them can be skipped. The plant makes 5 tons a day, so a full 40 ft container at a planning load of 26.5 t is a little over five days of output before any drying, weathering or packing.
| Stage | What it adds | Status |
|---|---|---|
| Pressing | The daily output against the load of the container | Output declared; load is a planning figure |
| Oven drying | 2 to 3 days | Declared |
| Weathering | A rest after drying and before packing | The length is stated on the weathering certificate |
| Printing own-brand boxes | 2 weeks for a new design, 10 working days for an existing one | Offered, confirmed in your quote |
| Production of one container | 21 days for a 20 ft, 21 to 25 days for a 40 ft | Offered, confirmed in your quote |
Definition
lead time
Lead time is the time from a confirmed order to the day the loaded container leaves the factory.
Each stage and the problem it can cause is described under how the coal is made here, and the checks of step six under what is checked at each stage.
3. What is not declared yet
The lead time above is an offered term, and three figures behind it are not declared. They are named here so that a buyer knows what to ask.
| Figure | Status |
|---|---|
| Production days per month | Not declared; this site gives no monthly output |
| Days from the first payment to loading, for a first and for a repeat order | Stated in your quote |
| Days from loading to arrival at your port | Not stated here; it depends on the carrier and the route |
Important
The date in your quote is the one that counts. If your order has a fixed date at your end, a season or a launch, say so in the quote form, and the reply will state whether the factory can meet it.
One stage cannot be shortened to meet a date: the charcoal rests after oven drying and before packing, and it is packed only after that rest.
Which papers arrive with step eight, and who issues each, is on the page about the documents for one order. The sea leg after loading is set by the sailing your forwarder books; where its time comes from is on the page about the port of loading and transit times. To get a lead time for your order, use the form below.