Quick answer
What does the certificate prove, and who stands behind it?
A weathering certificate is the shipper's statement that the charcoal rested between production and packing. At this factory weathering follows oven drying and comes before packing, and Cipto Winarno, Logistics Department Head, signs the certificate. The rule that makes the rest a condition of carriage for shisha charcoal is in the IMDG Code.
1. What a weathering certificate is, and is not
A weathering certificate is a declaration, not a test. The shipper states in writing that the charcoal rested between the end of production and the day it was packed.
| Question | Answer |
|---|---|
| Who issues it? | The shipper: the company that packs and declares the cargo |
| What does it state? | That the charcoal rested between production and packing, with the dates |
| Is it a laboratory report? | No. Nothing is measured by an outside laboratory |
| Is it issued by an authority? | No. It is the shipper's own statement |
| Does it say anything about quality? | No. It says nothing about ash, moisture or how the coal burns |
Definition
weathering certificate
A weathering certificate is the shipper's written statement that charcoal rested for a stated period between production and packing.
Definition
weathering
Weathering is the resting of freshly made charcoal in air, under cover, before it is packed.
The rest it records is one of the conditions for carrying charcoal by sea. The conditions are set out, each with the record a buyer can ask to see, on the page about loading conditions.
2. Who signs it
At this factory the certificate is signed by Cipto Winarno, Logistics Department Head. He also arranges the shipping, so the person who signs for the rest period is the person who arranges the shipment.
Weathering is a stage of production here, not a formality at the end. The coals are dried in the ovens for 2 to 3 days, to 3–4% moisture; they are weathered after the ovens and packed after that. The stages are described under how the coal is made here.
Note
A buyer usually sees a weathering certificate as a blank template. Ask for the certificate of your own order, with its dates and the name of the signer, together with the other draft documents.
3. What the certificate states
The factory has not yet declared which fields its certificate carries, so this page lists none as the factory's own. What a certificate should agree with is known: the dangerous goods declaration for the same container.
Charcoal is declared on the dangerous goods declaration as UN 1361, CARBON, animal or vegetable origin, Class 4.2. Since Amendment 42-24 the declaration also states the date of production, the date of packing and the temperature of the charcoal on the day of packing. (A carrier's statement of the rule: one source for the three added lines. The full list of fields is in chapter 5.4 of the Code and on the carrier's own form.)
Source: New IMDG Regulation: Mandatory Dangerous Goods Declaration for Charcoal (opens in new tab), Hapag-Lloyd, accessed
| Fact | Where it should also appear |
|---|---|
| The date of production | On the weathering certificate, as the start of the rest |
| The date of packing | On the weathering certificate, as the end of the rest, and on the packing list |
| The temperature on the day of packing | On the declaration; ask whether the certificate states it too |
The fields of the factory's own certificate are added to this page once the factory declares them.
4. What special provision 978 requires
The certificate exists because a rule makes the rest a condition of carriage. The rule is given here as the ledger of this site records it, with its source and the date it was checked.
Special provision 978 of the IMDG Code sets the conditions for charcoal (UN 1361). Before packing, the charcoal rests under cover in the open air for at least 14 days; or, where it is steamed and cooled after carbonising and packed under an inert gas, the packages rest for at least 24 hours before transport. It is packed only if its temperature is 40 °C or below on the day of packing. At least 30 cm of free space is kept above the cargo in the container. (Restated by a P&I club and a carrier; the Code text was not opened. The first three conditions are in both sources. Further conditions rest on one source each and are not stated on this site until they are confirmed against the Code or with a forwarder.)
Source: Safe carriage of charcoal in containers – changes in the International Maritime Dangerous Goods (IMDG) code, 8 January 2025 (opens in new tab), Britannia P&I, accessed
This page states no number of weathering days for this factory: the dates for an order are on its certificate. Why the conditions took the place of a test result is on the page about UN 1361, Class 4.2.
5. How to check a certificate
Four checks show whether a certificate is about your container. They take a few minutes and need only the other papers of the order.
-
The dates are in order
Production, rest, packing. The end of production comes first, the packing date last, and the rest between them is at least as long as the rule asks. A certificate dated before production ended cannot be about your order.
-
The signer is named
A person, not a stamp. The certificate carries the name and the job title of the person who signs it. At this factory that is the head of logistics.
-
The lot matches the packing list
Same order, same goods. The order reference, the product and the quantity on the certificate are those on the packing list and the commercial invoice.
-
The dates match the declaration
One set of dates. The dates of production and of packing on the certificate are the ones on the dangerous goods declaration for the same container.
To ask for the certificate of an order, use the form below or the contact page, with the topic "Document" and your order reference. How the certificate fits with the class, the conditions and the other papers is set out in the section on how a container of charcoal is shipped.