Quick answer
Which port does my container leave from, how long will it take to reach my port, and who says so?
Containers are exported from Jakarta, through the port of Tanjung Priok, which is the basis of the FOB price list. Trucking from the factory to the port is among the offered FOB terms. How long the sea leg takes is set by the line, the route and the sailing your forwarder books, and this page states a transit time only from a line's dated schedule.
The port and the timeline at a glance
- Port of loading
- Jakarta (declared), through the port of Tanjung Priok
- Trucking to the port, terminal handling, container stuffing
- Among the FOB terms (offered, confirmed in your quote)
- Production
- 21 days for a 20 ft container, 21 to 25 days for a 40 ft (offered, confirmed in your quote)
- Weathering rest
- Its length is stated on the weathering certificate
- Trucking time to the port, and the cut-off
- Stated in your quote
- Transit time
- From the line's dated schedule; none is stated without one
1. The loading port: Jakarta, Tanjung Priok
Every container leaves from Jakarta, the factory's declared port of loading, through the port of Tanjung Priok. The factory is in Legok, Tangerang, Banten, Indonesia, and the road leg to the port is part of the price: trucking to the port, terminal handling charges and container stuffing are among the offered FOB terms, as set out under what the FOB price covers.
Definition
port of loading
A port of loading is the port where goods are loaded on board the vessel that carries them, as named on the bill of lading.
The dated price list is quoted on the same basis, FOB Jakarta, so a listed price stops once the container is loaded on board there. Where the coal is pressed, dried and packed is shown on the page about the factory.
2. Before the ship sails: what the factory sets
The factory sets the time from a confirmed order to a container at the port. Four steps come before any sailing; the trucking time to the port and the cut-off are not declared yet.
| Step | What it takes | Status |
|---|---|---|
| Production of one container | 21 days for a 20 ft container, 21 to 25 days for a 40 ft | Offered, confirmed in your quote |
| Weathering rest | A rest after drying and before packing | The length is on the weathering certificate |
| Packing and loading at the factory | The cartons are loaded and the container sealed | Confirmed in your quote |
| Trucking to the port | Among the offered FOB terms | The time is stated in your quote |
| Cut-off before the sailing | Set by the line for each sailing | Stated in your quote |
The steps of an order, from the quote to the loaded container, are on the page about order steps and lead time. The rest before packing is recorded on the weathering certificate, which travels with the papers.
3. Where a transit time comes from
A transit time comes from the line that carries the container. The line publishes a schedule for each service, and the booking confirmation then names the vessel, the voyage and the dates for your container.
Definition
transit time
Transit time is the time a sailing takes from the port of loading to the port of discharge, as the shipping line states it in its schedule.
A schedule time is an estimate for one sailing. When the container changes ship on the way, the second vessel keeps its own schedule, and the container waits at that port for its connection.
Definition
transshipment
Transshipment is the transfer of a container from one vessel to another at a port between the port of loading and the port of discharge.
Under FOB your forwarder books the sailing, as set out under delivery terms and who books, so the time that applies is the one for the sailing it books. Each line's own conditions for carrying charcoal are in its notices, kept in the register of shipping lines' notices.
4. What to ask your forwarder
Four questions settle the sea leg before the booking is made. They go to your forwarder, who books the sailing under FOB.
| Question for your forwarder | Why it matters |
|---|---|
| Is the sailing direct, or does it transship, and where? | Each change of ship adds a second schedule and a wait for the connection. |
| What is the cut-off at Jakarta for the container and its papers? | Loading at the factory is planned back from the cut-off the line sets for the sailing. |
| How many free days does the line give at the destination for a container of dangerous goods? | Time at the port beyond them is charged, and under FOB those charges are the buyer's. |
| Does the line take UN 1361 to your port at the date of booking? | Each line decides its bookings; when one is refused, see what to do |
The ports this site names for each destination are on the country pages; the quote form takes any other port.
5. Transit times read from the lines' schedules
The table gives, for 12 lanes from Jakarta, the shortest and the longest transit time a line's schedule published, read at the line's own site. The times are for sailings leaving 27 November to 25 December 2026, read on 26 November 2026.
Container lines publish point-to-point schedules from Jakarta. For each sailing, the schedule gives the estimated departure and arrival, the transit time and the ports where the container changes ship on the way. The lines state these times as estimates that can change, and on one lane the time differs from sailing to sailing, because each routing has its own vessels and connections. (Each row is one lane, read at one line's own schedule search on the date shown, port to port from Jakarta, for sailings leaving in the four weeks after that date: the shortest and the longest transit time the schedule published, and the ports where the shortest sailing changes ship. A row is not a booking, a forecast or a promise of a sailing; the booking confirmation states the dates for a container. A port with no row is one these readings did not cover, or one where the lines read showed no sailing on the date read; it is not a closed port. The rows are read again every month; a row last read more than 45 days ago is not shown.)
Source: Point-to-point schedules from Jakarta, Indonesia (container yard to container yard) (opens in new tab), Maersk, accessed
| Jakarta to | Country | Line and schedule | Transit time as published | Shortest sailing changes ship at |
|---|---|---|---|---|
| Los Angeles | United States | Maersk (opens in new tab) | From 29 days 20 hours to 46 days 11 hours | Singapore and Shanghai |
| Vancouver | Canada | Maersk (opens in new tab) | From 39 days 16 hours to 59 days 21 hours | Shanghai |
| Mersin | Turkey | Maersk (opens in new tab) | From 21 days to 33 days 4 hours | Tanjung Pelepas and Port Said East |
| Beirut | Lebanon | Maersk (opens in new tab) | From 24 days 3 hours to 32 days 16 hours | Tanjung Pelepas and Port Said East |
| Latakia | Syria | MSC (opens in new tab) | From 24 days to 63 days | Singapore and Piraeus |
| Umm Qasr | Iraq | MSC (opens in new tab) | From 25 days to 37 days | Singapore and Khor Fakkan, then by road to Sharjah and by feeder ship to Umm Qasr |
| Aqaba | Jordan | MSC (opens in new tab) | From 26 days to 29 days | Singapore and King Abdullah Port |
| Jeddah | Saudi Arabia | Maersk (opens in new tab) | From 18 days 9 hours to 26 days 17 hours | Tanjung Pelepas |
| Jebel Ali | United Arab Emirates | Maersk (opens in new tab) | From 33 days 21 hours to 66 days 16 hours | Tanjung Pelepas and Khor Fakkan, then by rail |
| Felixstowe | United Kingdom | MSC (opens in new tab) | From 22 days to 43 days | Singapore |
| Hamburg | Germany | Maersk (opens in new tab) | From 33 days 4 hours to 39 days 2 hours | Tanjung Pelepas |
| Nhava Sheva (Jawaharlal Nehru Port) | India | Maersk (opens in new tab) | From 14 days 3 hours to 33 days 7 hours | Tanjung Pelepas |
A row older than 45 days is taken off by the next daily rebuild, not left standing. Plan on the dates in the booking confirmation, not on a row of this table.
To have the sailing planned with your order, name your destination port in the quote form or the form below.
Questions and answers
How long does a container take from Jakarta to my port?
What sets the date a container sails from Jakarta?
Does a transshipment add time to the voyage?
Where can I check a transit time for my port?
Sources
- Maersk: point-to-point schedule search from Jakarta (opens in new tab), Maersk — accessed
- MSC: point-to-point schedule search from Jakarta (opens in new tab), MSC — accessed
- Shipping to and from Indonesia: export, procedure for charcoal cargo (opens in new tab), Maersk — accessed